Bryn Mawr Hospital Office Building North – Canopy, Overhead Protection System
This is the second post of many about our overhead protection systems at Bryn Mawr Hospital. As I mentioned in a previous post, Bryn Mawr Hospital is undergoing a massive $200 Million, 200,000sf Patient Pavilion addition and Superior Scaffold was called in to provide scaffolding support. This 205 foot long system scaffold canopy runs along the front side of the North Medical Office building to the garage entrance and provides a walkway for patients and pedestrians who would typically enter on the other side of the building. They are currently being re-routed from the other side of the building due to the...
Read More