Posts Tagged ‘innovative’

Superior Scaffold, Grow Solar, Sales, Rental, service, Support, 215 743-2200

Superior Scaffold helps install innovative solar array over Camden County Wastewater Treatment Plant.

Superior Scaffold, Grow Solar, Sales, Rental, service, Support, 215 743-2200

In a first of a kind move, the Camden County Municipal Utilities Authority (CCMUA) of New Jersey embraced the growing need for renewable energy by installing a giant array of solar panels over the Camden, NJ water treatment plant.  The panels will provide enough power to run the day-to-day operations of the plant (producing more than 2.2 million kilowatt hours each year in energy offsetting production costs.)

Sales, rental, service, support, scaffolding  Sales, rental, service, support, scaffolding

These arrays will enable the company to become more cost efficient and reduce the carbon footprint needed to treat wastewater.

Scafffolding, sales, service, support, 215 743-2200   Superior Scaffold, Scaffolding, Support, Service, Rental, (215) 743-2200, www.superiorscaffold.com

The Challenge

Superior scaffold’s challenge was to devise a way for the crews to install the 7,000 solar panels over the large aeration and sediment tanks WHILE the plant remained operational.  Superior’s crew (headed by Kenny Foreman) and groSolar decided to incorporate a series of aluminum beams and plywood decking that would provide platforms over each series of tanks to erect their solar arrays.

Superior Scaffold, Sales, rental, Service, Support, (215) 743-2200, www.superiorscaffold.com     Superior Scaffold, Scaffolding, support, service, sales, rental, (215) 743-2200, www.superiorscaffold.com  Superior Scaffold, scaffolding, sales, service, rental, (215) 742-2200, www.superiorscaffold.com  Superior Scaffold, scaffolding, service, support, rental, 215 743-2200

“Once the panels and their supports are permanently installed, the decking system can be easily moved over the next tank in a leapfrog type endeavor,” said Superior’s estimator, Anthony Pini.

Here is what the final product looks like.

Grow Solar, Superior Scaffold, Scaffolding, Service, Support, Rental, (215) 743-2200

Grow Solar, Superior Scaffold, scaffolding, sales, service, support, rental, (215) 743-2200, www.superiorscaffold.com   Superior Scaffold, scaffolding, Sales, rental, support, service (215) 743-2200

Many wastewater treatment plants are in a unique position to be able to take advantage of solar power because of their large physical size that often includes many unused acres.  Superior is thrilled to help the Camden County MUA realize this potential.  The County Regional Wastewater Treatment System treats the sewage discharged every day from properties in Camden County. The Camden County MUA treats 58 million gallons (220 million liters) of sewage per day at their two plants.

Camden County is located in the southwestern portion of New Jersey, across the Delaware River from Philadelphia. Burlington, Atlantic, and Gloucester Counties border Camden County on the north, east, and south. The County is 226 square miles in area, with a population of about 500,000. There are thirty-seven municipalities in Camden County.


Superior Scaffold was called in to assist with the renovations of the historic Strawbridge & Clothier building in downtown Philadelphia.  The 100 year-old building was once the worlds largest dry goods building.  Over the years it has sat in disrepair until they decided to bring it back to it’s former glory.  They new center will be home for 100 businesses as 1000 residential units.  They are doing a superb job of keeping the old style while giving the new structure nice upgrades.

scaffold rental, scaffolding rental, pa, philly, philadelphia

The bank of 20 elevators, yes, I said 20 elevators, wow, are a glorious site to see, however, only 10 will remain in service.  The other shafts will be used for vents, electrical, plumbing and other things.  It’s really a smart use of space.

Superior was called in to help assist crews working in the elevator shafts.  Aluminum beams were placed across the open shafts on specific floors and then planked so crews could work inside the actual shaft.  The units were moved up each floor as needed.

215 743-2200
Shoring, scaffolding

215 743-2200

I just find it fascinating the ways crews can use scaffolding to access different parts of jobs, all kinds of jobs, large and small.


Cool Technology X-Ray for a facade renovation at the Golden Nugget Hotel Casino! Why?

Now I’ll be honest with you.  I’m a sucker for cool technologies being used in innovative ways (just see my previous blog entry about the hanging scaffold system).  But when I learned what Superior Scaffold had to go through to get their giant mast climbers up to do the renovation work, I had to blog about it.

Did you  know that they actually had to X-Ray the cement on the side of the building to locate floor slab tie locations?  Yep.  And after having it explained to me it makes total sense.  You see the tall (dual) masts for the Mast Climber 3615 have to be anchored to the building at their highest point (for obvious reasons) while also being stabilized on the ground.  This allows for the platform to climb up and down the masts effortlessly.  Now, I never gave much thought on how they did it – just that they had to be attached somehow.  But logically, you just can’t go drilling into any place on the side of a building.  You need a very sturdy anchor point.  But since the Trump Marina was constructed with post tension floors there was the possibility of having steel reinforcements inside the slabs. Thus – the X-RAY machine!

The X-Ray technician had to xray specific points on the building to determine if they were free of steel so the anchors for the mast climbers could be installed.  And while he was up there, he also Xray’d the masonry condition of the exterior so they would have a better idea of what needed to be repaired before they put the new facade on.

Once the technician gave the approval for the mast climbing anchor point – the crew had to cut out the exterior brick exposing the cement floor slab tie location so they could install the fasteners – and then the masts.

Here’s a great shot of the crew installing one of the masts at the Golden Nugget.

And here’s the underside of the MC-3615 platform.

And once both masts are anchored and the platform is in place – it can be put into service.  Here it is going up for the first time.

And once all of the 8 masts were anchored to the exterior of the Golden Nugget.  This is what it looks like.

If you look carefully, you can see the fourth unit on the right side of the building.  An X-Ray machine?  Who would have thought a scaffolding company would be so hip.

The work continues on the facade renovation.  The workers used the mast climbers to install a unique scratch coat of a new type of material (specifically designed for this job) over the existing brick – essentially giving it a facelift.  I’ll have more shots in my next entry.