July 2013

‘Scuse me while I kiss the sky – Scaffolding the New Dover High School Auditorium

Jimi Hendrix might have been thinking of other things when he wrote those lyrics but if he was around today in the new Dover High School auditorium (Dover, DE) he’d be singing about Superior Scaffold’s ability to get crews up to the ceilings of very tall structures, just like this state-of-the-art hall. And that’s just what we did on this very cool job.  Crews needed a way to get to very top of the new auditorium so Superior devised a system scaffold platform that was able to span the entire length and width of the space from the stage across the...

Read More

Superior Scaffold to provide scaffolding support for Philadelphia Energy Solutions turnaround at old Sunoco refinery.

Superior Scaffold has entered into a deal with Philadelphia Energy Solutions (PES), to provide scaffolding support for a turnaround at their large Philadelphia plant.  This is the Point Breeze refining complex – which is the old Sunoco plant in South Philly. Philadelphia Energy Solutions (PES) is the longest continuously operating refinery on the East Coast, processing 330,000 barrels of crude oil per day into various refined products. Superior will provide all of the necessary scaffolding support during this shutdown.  “Our guys are currently working with PES planning and organizing the massive turnaround so everything goes smoothly,” said Lou Collins, Superior Scaffold estimator....

Read More
Scaffolding, PA, Philly, U of P, University of Pennsylvania, Superior Scaffold, (215) 743-2200

Univeristy of Pennsylvania Museum of Archaeology and Anthropology completes phase 2 of $15 Million renovation

The University of Pennsylvania Museum of Archaeology and Anthropology | at 3260 South Street | Philadelphia, PA 19104 | (215) 898-4000 has just completed phase 2 of it's extensive renovations. Widener Lecture Hall now looks like this after a complete restoration - thanks to the many craftsman and companies that took part - including us - Superior Scaffold. The completion of the Widener Lecture Hall marks the end of the second phase of the Penn Museum of Archeology and Anthropology’s $15 million renovations of its west wing, which began in 2010. This is what it looked like when Superior was brought in to provide...

Read More

Changing ceiling tiles is MMM MMM good at Campbell’s Soup Headquarters.

This is one of those, once in a lifetime, cool jobs that you just have to brag about.  Superior Scaffold was called out to the Campbell’s Soup Worldwide Headquarters in Camden, NJ to rig a special scaffolding in the boardroom. This is the same boardroom where one of  the original Andy Warhol Campbell Soup Can paintings lives. And even cooler was the job.  We had to come up with system to allow crews to change the ceiling tiles over the handmade wood table that resides in the boardroom.  Sounds simple, right?  Not really.  The table is 8 feet wide by 30 feet...

Read More