Cantilever Scaffold

Custom engineered scaffold designs to reach impossible areas. Our experienced engineers and designers can provide you with unique solutions that get your men and material into previously inaccessible areas.

If you are adding floors to the top of an existing building or creating a crane landing platform 30 floors up, using a cantilever system may be your answer.   See some examples below of how Superior Scaffold can design a solution for you.

3601 Market St. – Give crews room to construct a decorative steel structure on the roof.

Parc Rittenhouse – Use a cantilever system when adding floors at the top of an already existing building.

Bryn Mawr Hospital. – When you need more room to fly pre-fabricated wall panels up with a crane and then land them somewhere.

The Sterling House Apartments (18th & Jfk) – Create a man material landing platform 30 floors up for new construction.

There are a multitude of uses for our superior cantielver system from swing staging to supporting entire floors.

See the many pics and video of the 3601 Market St. Cantilever here:

For more information see the Parc Rittenhouse Solution

Read the Bryn Mawr Landing Platform solution here:

See our The Sterling House cantilever solution here:

See our more in depth blog here: