Archive

Seneca Niagara Casino Hanging Work Platform

This was an enormous multipoint suspended platform job. What this project entails is getting crews up underneath the ceiling while the casino remains open for business as usual so they can get the new HVAC and mechanicals installed. The solution came in the form of what is called a multi-point suspended scaffold. It’s not only wide, but stable enough to hold equipment, rolling towers, HVAC piping, etc. These giant work platforms actually hang from chains from the arched trusses at the ceiling. It’s netted in so nothing can fall off of the sides and its sturdy enough to support just about...

Read More

Princeton University, Firestone Library

Princeton University Firestone Library Superior Scaffold was selected to help in the renovation of Princeton's Prestigious Firestone library because of its long history working with historic buildings on the campus. We were one of the few companies there throughout the entire process. The renovation is a long-term project that is being done in multiple phases and will take almost 10 years to finish, during which time the library will remain open, and its collections available during normal hours of operation. Superior erected as system scaffold allowing crews to get access to all areas of this monumental restoration and parapet wall replacement project. The...

Read More

Caesars Casino & Resort, Suspended Scaffold

Caesars Casino & Resort Caesars Atlantic City Resort has been expanding and renovating constantly in the past decade with a new hotel tower, parking garage and shopping center. It opened as Atlantic City’s second casino in 1979 as the Caesars Boardwalk Regency. Like it’s counterpart in Los Vegas, Caesars has an ancient Roman theme and boasts 3400 slot machines and is now one of the largest resorts in the area. Superior Scaffold’s swing stage department was called in to help with the EFIS facade replacement on the towers. Superior had to install a roof perimeter guardrail, and duct protection of system scaffold...

Read More

Princeton Academy of the Sacred Heart

Princeton Academy of the Sacred Heart Sacred Heart is expanding this old structure in a big way, updating the old 4 story brick school building to a more open-style learning environment. But to do that – they needed to take out most of their support walls and put new steel and concrete in to carry the weight. Normally, not a big deal because you do it one floor at a time. But this job was doing it ALL AT ONCE… Yes, 4 massive floors of concrete and steel being supported or shored up at once. Superior Scaffold engineer, Bob Robinson, had to design...

Read More

The Revel Resort & Casino (Nightclub) – Atlantic City, NJ

The Revel Resort & Casino (Nightclub) - Atlantic City, NJ In a move only reserved for mythological creatures, the Revel on Atlantic City’s boardwalk has risen like a Phoenix from the ashes of a shattered economy. As the only remaining project (out of 4 similar) to survive the doldrums of a recession – it’s now poised to become the centerpiece of the boardwalk. With an infusion of cash ($1.7 Billion from China) construction has moved full steam ahead. The project, which was mothballed almost two years ago has been given new life and is almost at full capacity. The history of how...

Read More

Philadelphia’s historic Independence Hall clock tower

Philadelphia’s historic Independence Hall clock tower The birthplace of the Declaration of Independence and the Constitutional Convention was due for a major renovation. Superior Scaffold was chosen to handle this 14-month, $5.6 million dollar venture because of their skill and experience with working with delicate historic projects. This current version of the tower, designed by William Strickland, was built in 1828, after the original, housing the Liberty Bell, was found unstable and had to be dismantled. Several major challenges confronted the Superior Scaffold design team. First, scaffolding had to be erected so workers could get at every aspect of the building renovation,...

Read More

Hanging Bridge Platform, Cherry Hill, NJ

Hanging Bridge Platform, Cherry Hill, NJ Superior was called in to provide a very unique way to get beneath this bridge to make repairs. Instead of anchoring a barge in the water beneath the bridge, or parking a giant truck with a bridge inspection bucket (like a cherry picker with a platform) above it we chose to suspend a platform from the steel beams and girders beneath the bridge itself. The brackets hold the weight of the scaffold platform beneath it and all of the workers, equipment, and parts necessary to make the repairs. It’s effective way to get beneath this structure. By...

Read More

Golden Nugget Hotel & Casino, Atlantic City, NJ

The former Trump Marina hotel and casino, in Atlantic City, has been purchased by Landry’s Inc., an international gaming and restaurant operator, and is being rebranded with the Golden Nugget Name. Superior Scaffold has been brought in as part of the $100 Million renovation to help with the façade restoration of both the 220' high bay tower, and the 90' high Crystal tower of the Golden Nugget. Superior installed 4 MC-30 Mast Climbing Platforms and has 18 swing stages on the job. We have also installed 170' of overhead protection for the Atrium glass on the pool deck and stair towers for...

Read More

University of Pennsylvania, Quadrangle

University of Pennsylvania, Quadrangle When the University of Pennsylvania needed scaffolding to renovate their 1895 Quadrangle, they turned to Superior to provide it. The $67 million dollar project has restored and adapted the U of P’s most prominent historic buildings and once again made it the hub of intellectual, social, and recreational activity....

Read More

Smith Memorial Playhouse – Scaffold & Shoring

Smith Memorial Playhouse The building was designed solely as a play space for children by one of Philadelphia’s most prominent late 19th century architects, James H. Windrim. The open layout of the 24,000 square foot three story brick and masonry structure features floor to ceiling windows, porches and room upon room with a variety of play opportunities for children. Superior engineers designed a system scaffold that would allow the $7 million renovations to take place while the building and grounds remained open for business. Superior’s task was to allow workers access to the playhouse roof, exterior walls, cornice and windows, as well...

Read More