A restoration performance for the ages! ★★★★ “Renovating the Sedgwick”. Playing now!
As casting goes, you can choose an up and comer or a quantifiable veteran of the arts. And as theater renovation performances go – Superior Scaffold (a Sunbelt Rentals Company) has performed at all the greats in the tri-state area. So when director and GC, INTECH, and assistant director, MPG (Masonry Preservation Group) decided to cast a lead in the exterior renovation of the prestigious playhouse, they called Superior Scaffold – A veteran of almost every theater in the tri-state area.
For those who don’t know, The Sedgwick Theater is a historic American theater in the Mt. Airy neighborhood of Philadelphia, Pennsylvania. It was built in 1928 and designed by architect William Harold Lee. Originally built as a 1,600-seat movie palace complete with a built-in pipe organ and orchestra pit, the Sedgwick has undergone several transformations throughout its history.
It has hosted everything from classic musicals such as Pippin, The Pirates of Penzance, My Fair lady to Shakespearean ensembles such as Midsummer Night’s dream, Macbeth, King Lear, to contemporary pieces and even diverse cultural acts.
Quintessence (formally the Quintessence Theatre Group) is a Barrymore Award-winning, professional classical repertory theater company based in the Mt. Airy is leading the production of “Renovating the Sedgwick”. They are breathing new life into this theatrical establishment.
“We are honored to steward the restoration of this Art Deco masterpiece. Over the next decade, this multi-phase construction project will see the Sedgwick renewed as one of Philadelphia’s great cultural destinations.” Said an actor, to remain anonymous.
Let’s talk about our scaffold, shalst we? We provided a system scaffold complete with ladder and gate access and debris netting for renovation crews to perform their best work repointing, refurbishing and replacing the brick and terra cotta on the façade.
We also erected an overhead protection system to allow pedestrians access to the sidewalk and theater entrance while renovation performances went on overhead.
Some of the challenges our crew had to overcome were just how precise the scaffold had to be with the ever changing – landscape of the façade. There were several bump outs and artistic design elements of the building that we had to erect around.
Then there was also the 3 tall terra cotta piers at the top that needed 360 degree access. Our production crew performed flawlessly at the higher level.
Another fun fact, the street is old cobblestone! So, there was no staging area, and our crew had to work from the truck out front. A testament to complete the job safely for customers, pedestrians and themselves.
We worked hand in hand with the INTECH, and MPG and surrounding residence to make sure the renovation was as least invasive as possible and visually pleasing to the residences and business on the street.
Once everything was repointed our scaffold came down and they would put the new awning up with times and signage. This exterior renovation will make her look fantastic for years to come!
Never wish a theater actor, “good luck” – as it is just the opposite in that world. Instead, say, “break a leg”. So, with that in mind, we say to everyone at the newly renovated Sedgwick Theater and Quintessence – “Break a leg” and make this the most productive and profitable theater in the area!
Any good production takes a talented ensemble! We are grateful for director and GC – INTECH and assistant director MPG for casting us. We also have to give a shout out to fellow cast mates – VMA (Voith & Mactavish Architects, K&H (Keast & Hood) – Structural Engineers, and Owner’s Rep – Dan Bosin & Associates for their contributions to the production of “Renovating the Sedgwick”! Opening soon!
And if you need scaffolding or access, call Cameron at (215) 743-2200 or visit www.superiorscaffold.com today.
And our musical number is a fitting one – and I wanted to hear some Rush – so here goes! Enjoy.
Question and answers for the Scaffold expert, Shawn MacDonald, from www.scaffoldguru.com.
Question: How should we go about scaffolding an historic theater, art house or playhouse?
Answer: Well, since they are all under the category of “The Arts”, most likely, the architecture will reflect that in the design. Meaning the architecture will have elements that add flair to the building’s structure and make it harder to erect traditional scaffold that meets OSHA requirements and gives crews a place to work. The regulation states that the front edge of the platform has to be no less more than 14″ away from the structure (work surface), otherwise a guardrail or personal fall arrest is required. Bump outs, recesses, and design flair can make getting the scaffold close enough to the building difficult to achieve. So you need to hire a reputable scaffold company like Sunbelt Rentals or Superior Scaffold, which has the expertise and equipment to do the job safely.
Question: How do you get up close and personal when erecting a scaffold around an historic building?
Answer: Using outrigger side brackets, often mistakenly called “outriggers” (even by this author) can allow scaffold erectors to get the front edge of the work platform close enough to the work for crews to accomplish their tasks without the need for a front guardrail. And if you look at the pictures in this blog, you will see just how close a skilled scaffold erector, using the right equipment can get.
#scaffold #scaffolding #rental #rent #superiorscaffold #restoration #inspection #construction #facade #masonry #canopy #protection #howto #erection #install #emergencyservices #masonry #suspendedscaffold #mastclimber #canopy #philly #philadelphia #pa #electrical #pa #de #nj #ny #md #hoist #buckhoist #lift #saia #excellenceisbuilding #transportplatform #elevator #glass #electrical #workdeck #painter #painting #restoration #lift #hoist #GBCA #BuildingOurFuture #excellenceisbuilding #sedgwicktheater #INTECH #mpg #masonrypreservationgroup
